Focus on Construction Contract Change Orders
DISCLAIMER
Before purchasing, review the rules of your licensing or certifying entity. It is your responsibility to confirm this course meets your CE requirements. See the credit tab on the course page for details.
What’s Included: Full webinar recording, written course materials, expert instruction, a mandatory quiz, and a certificate upon completion.
Deliverability Timeline: All courses are generally available within 1-2 weeks after the live presentation.
CE Credits: AIA and/or LA/CES accreditation is available by request for courses recorded prior to March 11, 2026. All courses after that date include those accreditations by default, if applicable. With these accreditations, our courses qualify for credit in nearly all states for engineers, surveyors, architects, and landscape architects.
Learn more about the on-demand format in our FAQ or contact us at (715) 835-5900 or customerservice@halfmoonseminars.org
Agenda
Webinar instructions will be emailed before the date of the webinar.
Please log into the webinar 15 – 30 minutes before start time.
Wednesday, November 17, 2021
8:30 – 10:30 am CST
Presented by
A.J. Manion,
Danny Fuchs
Learn what a change order is, who initiates the change order process, typical changes that
result in change orders and what happens when the parties can’t agree.
Webinar Instructions
All attendees must log-on through their own email – attendees may not watch together if they wish to earn continuing education credit. HalfMoon Education Inc. must be able to prove attendance if either the attendee or HalfMoon Education Inc. is audited.
Certificates of completion can be downloaded in PDF form upon passing a short quiz. A link to the quiz will be sent to each qualifying attendee immediately after the webinar. The certificate can be downloaded from the Results page of the quiz upon scoring 80% or higher.
Webinars are presented via GoToWebinar, an easy-to-use application that can be run on most systems and tablets. Instructions and login information will be provided in an email sent close to the date of the webinar. It is highly recommended that you download, install and test the application before the webinar begins by clicking on the link in the email.
GoToWebinar App requirements:
Windows 7 – 10 or Mac OSX Mavericks (10.9) – macOS Catalina (10.15)
Web Browser:
The two most recent version of the following browsers:
Google Chrome, Mozilla Firefox, Apple Safari, Microsoft Edge
Internet Explorer v11 (or later) with Flash enabled
Internet connection: Minimum of 1Mbps Hardware: 2GB RAM or more
For more information, visit the Support section at www.gotowebinar.com
Credits
Professional Engineers:
2.0 PDHs
Architects:
2.0 CE Hours (non-HSW)
AIA: (AIA credits only available for attending live Webinar)
2.0 LU | Elective
International Code Council:
.20 CEUs (Administration)
Continuing Education Credit Information
See each course listing for the type and amount of each continuing education credit available. Individual courses for engineers and architects are not subject to pre-approval. HalfMoon Education does not apply for landscape courses in FL, NC, and NJ or land surveyor courses in NJ or TN, unless expressly stated.
HalfMoon Education Certifying Entities
American Institute of Architects Continuing Education System (No. J885)
International Code Council (No. 1232)
Landscape Architect Continuing Education System
American Institute of Certified Planners (AICP)
Boards of Engineering: Florida (No. 0004647), Indiana (License No. CE21700059),
Maryland, New Jersey (Approval No. 24GP00000700), and North Carolina (No. S-0130).
Course-by-Course Providers:
Association of State Floodplain Managers
International Society of Arboriculture
Society of American Foresters
HalfMoon Education is deemed a New York-approved continuing education provider for engineers, architects, and landscape architects via its registration with the American Institute of Architects Continuing Education System (Regulations of the Commissioner §68.14(i)(2), §69.6(i)(2), and §79-1.5(i)(2)). Only AIA HSW-approved courses qualify for New York engineering credit.
Completion certificates will be awarded to participants who complete this event, respond to prompts, and earn a passing score (80%) on the quiz that follows the presentation (multiple attempts allowed).
Speakers
Danny Fuchs
Partner at Manion Stigger, LLP
Mr. Fuchs is a partner in Manion Stigger, LLP. He has extensive experience in construction supporting general contractors, specialty subcontractors, owners, suppliers and design professionals on construction of power generation plants, petrochemical facilities, paper mills, food processing plants, governmental buildings, healthcare, hospitality, commercial and multifamily facilities across the country. Mr. Fuchs was educated as a civil engineer and leans heavily on his years of experience on site as a project engineer, manager, and estimator for a regional industrial contractor to provide practical advice and meaningful analysis. He has drafted and negotiated contracts to facilitate project delivery through design-bid-build, design-build, EPC agreements, construction management at-risk and as-advisor, and fast-tracked construction methods. He has successfully resolved disputes through litigation, arbitration, and mediation in cases involving scheduling problems, acceleration, delays, defective construction, defective design, termination, and bond claims.
A.J. Manion
Co-Founder of Manion Stigger, LLP in Evansville, INMr. Manion is Co-founder of Manion Stigger, LLP, a law practice devoted to representing and advising construction professionals. Prior to his legal career, Mr. Manion. was educated as an engineer and worked in project management for an ENR 100 contractor. Before Manion Stigger, he was part of the national construction practice of an AMLAW 200 firm and a law clerk in the United States District Court. His three decades’ experience in construction includes prosecuting and defending large payment claims in a variety of construction contexts, drafting and negotiating hundreds of construction-related transactions, and working closely with clients to manage operational risk. Mr. Manion brings to each task the combined lessons of an engineering education, MBA education, project management background, experiences as an advocate. Manion Stigger represents general contractors, construction managers, design-builders, and specialty contractors throughout the United States.
AIA Info
AIA Provider Statement:
HalfMoon Education Inc. is a registered provider of AIA-approved continuing education under Provider Number J885. All registered AIA/CES Providers must comply with the AIA Standards for Continuing Education Programs. Any questions or concerns about this provider of learning program may be sent to AIA/CES (cesupport@aia.org or (800) AIA 3837, Option 3).
This learning program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.
AIA continuing education credit has been reviewed and approved by AIA/CES. Learners must complete the entire learning program to receive continuing education credit. AIA continuing education Learning Units earned upon completion of this course will be reported to AIA/CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.
Course Title: Focus on Construction Contract Change Orders
Delivery Method: Live Online
Course Description: This course examines construction contract change orders. Topics include reviewing the contract and understanding the change clause, typical changes that result in change orders, the necessity for all parties to agree, getting it in writing, and how to resolve disputes that arise from changes.
Learning Objectives:
Learning Objective 1:
Learners will be able to explain what a change order is and who can initiate the change order process.
Learning Objective 2:
Learners will be able to provide examples of the types of project scope and timing changes that typically result in change orders.
Learning Objective 3:
Learners will be able to discuss and reference examples of construction contracts and identify the changes clause.
Learning Objective 4:
Learners will be able to describe contractual mechanisms for resolving disputes that arise from changes.
LUs: 2.0 LU Type: LUs
Prerequisites: Some experience with construction contracts
Advance Preparation: None
Program Level: Intermediate
Course Expiration Date: None
Complaint Resolution Policy:
Complaints regarding this course can be emailed to tcase@halfmoonseminars.org or by calling (715) 835-5900. A HalfMoon Education representative will respond within 72 hours to resolve the complaint, which will include, but not limited to, access to another CE activity at no or reduced cost or a full or partial refund. Each instance will be resolved on a case-by-case situation.