Construction Scheduling and Cost Control
DISCLAIMER
Before purchasing, review the rules of your licensing or certifying entity. It is your responsibility to confirm this course meets your CE requirements. See the credit tab on the course page for details.
What’s Included: Full webinar recording, written course materials, expert instruction, a mandatory quiz, and a certificate upon completion.
Deliverability Timeline: All courses are generally available within 1-2 weeks after the live presentation.
CE Credits: AIA and/or LA/CES accreditation is available by request for courses recorded prior to March 11, 2026. All courses after that date include those accreditations by default, if applicable. With these accreditations, our courses qualify for credit in nearly all states for engineers, surveyors, architects, and landscape architects.
Learn more about the on-demand format in our FAQ or contact us at (715) 835-5900 or customerservice@halfmoonseminars.org
Agenda
Webinar instructions will be emailed before the date of the webinar.
Please log into the webinar 15 – 30 minutes before start time.
Wednesday, December 28, 2022
9:00 am – 12:45 pm CST
Thursday, December 29, 2022
9:00 am – 12:45 pm CST
Presented by
Joseph W. Delaney PhD P.E. PgMP CCM LEED AP
Agenda: Day 1 – December 28, 2022
Construction Scheduling
CMP Scheduling
Work Breakdown Structure
Defining Activities
Activity Durations
Sequence Logic
CPM Scheduling Algorithm
Scheduling with Microsoft Project
Program Evaluation and Review Technique (PERT)
Short Term Scheduling
Agenda: Day 2 – December 29, 2022
Construction Cost Control
Establishing Construction Budgets
Construction Cost Estimating
Types of Estimates
The Estimating Process
Using the RsMeans On-line Cost Database
Earned Value Analysis
Webinar Instructions
All attendees must log-on through their own email – attendees may not watch together if they wish to earn continuing education credit. HalfMoon Education Inc. must be able to prove attendance if either the attendee or HalfMoon Education Inc. is audited.
Certificates of completion can be downloaded in PDF form upon passing a short quiz. A link to the quiz will be sent to each qualifying attendee immediately after the webinar. The certificate can be downloaded from the Results page of the quiz upon scoring 80% or higher.
Webinars are presented via GoToWebinar, an easy-to-use application that can be run on most systems and tablets. Instructions and login information will be provided in an email sent close to the date of the webinar. It is highly recommended that you download, install and test the application before the webinar begins by clicking on the link in the email.
GoToWebinar App requirements:
Windows 7 – 10 or Mac OSX Mavericks (10.9) – macOS Catalina (10.15)
Web Browser:
The two most recent version of the following browsers:
Google Chrome, Mozilla Firefox, Apple Safari, Microsoft Edge
Internet Explorer v11 (or later) with Flash enabled
Internet connection: Minimum of 1Mbps Hardware: 2GB RAM or more
For more information, visit the Support section at www.gotowebinar.com
Credits
Professional Engineers:
6.5 PDHs (no NY credit)
Architects:
6.5 non-HSW CE Hours
6.5 AIA LU| Elective
International Code Council:
.65 CEUs (Administration)
Continuing Education Credit Information
This webinar is open to the public and is designed to qualify for 6.5 PDHs for professional engineers and 6.5 non-HSW continuing education hours for licensed architects in all states that allow non-HSW coursework.
HalfMoon Education is an approved continuing education sponsor for engineers in Florida (Provider No. 0004647), Indiana (License No. CE21700059), Maryland, New Jersey (Approval No. 24GP00000700) and North Carolina (S-0130). Most other states do not preapprove continuing education providers or courses.
This course is not approved in New York and other states which require HSW coursework.
The American Institute of Architects Continuing Education System has approved this course for 6.5 LU| Electives (Sponsor No. J885). Only full participation is reportable to the AIA/CES.
The International Code Council has approved this event for .65 CEUs in the specialty area of Administration (Preferred Provider No. 1232).
Attendance will be monitored, and attendance certificates will be available after the webinar for those who attend the entire course and score a minimum 80% on the quiz that follows the course (multiple attempts allowed).
Speakers
Joseph W. Delaney, P.E., PgMP, CCM, LEED AP
President and General Manager at Delaney CMS in Union Springs, New YorkDr. Delaney is president and general manager of the construction management services group at Delaney CMS in Union Springs, New York. He is the former president of C&S Design Build Inc., C&S’s program and construction management company, where he started the agency construction management business. In his 12-year career there, he developed it into the fastest-growing and most profitable of the firms’ business units. At C&S, Dr. Delaney was responsible for more than $1 billion in completed projects in the education, municipal, wastewater, airport, and private development sectors. In his 25 years as a construction professional, he has served in many roles including those of project engineer, design coordinator, superintendent, construction manager, program manager, general manager, and president. Dr. Delaney is a licensed professional engineer, holds the program management professional (PgMP®) credential, is a certified construction manager (CCM®), and is a Leadership in Energy and Environmental Design (LEED®) accredited professional. Dr. Delaney is the only person in the world with all these credentials. In addition, he is an expert critical path method scheduler and has presented both nationally and internationally on construction, project, and program management. Dr. Delaney received his bachelor’s, master’s, and PhD degrees in Civil Engineering from the State University of New York at Buffalo. He enjoys sharing his experience leading teams, and he has provided management training to senior management including his colleagues at the American Council of Engineering Companies (ACEC) Senior Executive Institute and at Fortune 500 companies, including Johnson & Johnson, Inc., and L3 Communications. Dr. Delaney was recently the keynote speaker at the Tri-State Diversity Summit where he shared Delaney CMS’s (a woman-owned business enterprise) vision for equality and empowerment. He is also a professor in the Construction Management Department at Southern Mississippi University. He recently published a university textbook titled Construction Program Management by CRC Press. The textbook is used to teach undergraduate and graduate students and by practitioners to help them formulate a process-based approach for management of large projects and programs.
AIA Info
AIA Provider Statement:
HalfMoon Education Inc. is a registered provider of AIA-approved continuing education under Provider Number J885. All registered AIA/CES Providers must comply with the AIA Standards for Continuing Education Programs. Any questions or concerns about this provider of learning program may be sent to AIA/CES (cesupport@aia.org or (800) AIA 3837, Option 3).
This learning program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.
AIA continuing education credit has been reviewed and approved by AIA/CES. Learners must complete the entire learning program to receive continuing education credit. AIA continuing education Learning Units earned upon completion of this course will be reported to AIA/CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.
Course Title: Construction Scheduling and Cost Control
Delivery Method: Live Online
Course Description: This 6.5-hour course will assist design professionals in scheduling construction projects efficiently and keeping costs controlled by using the following tools and techniques: CMP scheduling, Program Evaluation and Review Technique (PERT), short term scheduling, establishment of budgets, estimating and earned value analysis.
Learning Objectives:
Learning Objective 1:
Learners will be able to utilize CMP scheduling algorithm, Microsoft Project and a work breakdown structure, and define and determine activities, durations and sequence logic.
Learning Objective 2:
Learners will be able to utilize the Program Evaluation Review Technique (PERT) to visualize a schedule and identify opportunities for interim jobs and alternate timelines.
Learning Objective 3:
Learners will be able to establish construction budgets and assist in construction cost estimates through an understanding of the types of estimates, the estimating process and data.
Learning Objective 4:
Learners will be able to engage in short term scheduling and earned value analysis to assess project completion.
LUs: 6.5 LU Type: LU|HSWs.
Prerequisites: None
Advance Preparation: None
Program Level: Intermediate
Course Expiration Date: 10/27/2025
Complaint Resolution Policy:
Complaints regarding this course can be emailed to fchapman@halfmoonseminars.org or by calling (715) 835-5900. A HalfMoon Education representative will respond within 72 hours to resolve the complaint, which will include, but not limited to, access to another CE activity at no or reduced cost or a full or partial refund. Each instance will be resolved on a case-by-case situation.