Agenda

Registration:                    8:00 – 8:30 am

Morning Session:             8:30 am – 12:30 pm

Lunch (On your own):       12:30 – 1:30 pm

Afternoon Session:           1:30 – 5:00 pm

Overview of Major Changes in 2017 National Electrical Code

   Article 425: Fixed Industrial Process Heating
   Article 691: Large-Scale PV Electric Power Production
   Article 706: Energy Storage Systems
   Article 710: Stand-Alone Systems
   Article 712: Direct-Current Microgrids

Chapter 1: National Electrical Code

   Requirements for electrical installations, including clearances
      and free space requirements about equipment
   New reconditioned equipment, identification and traceability;
   New limited access working space requirement
   New short-circuit current documentation

Chapter 2: Wiring and Protection

   Grounded conductors
   Voltage drop calculations
   Branch circuit, feeder and services calculations
   GFCI receptacle outlet requirements
   Service requirements
   Transformer protection
   New GFCI protection for non-dwelling units

Grounding and Bonding

   Grounding of service entrances
   Grounding of separately-derived systems
   Grounding electrodes
   Sizing of grounding electrode and grounding conductor
   Bonding of services

Chapter 3: Wiring Methods and Materials

   Wiring methods—underground installation requirements
   Conductors for general wiring
   Conductor ampacity correction and adjustments
   Number of conductors in a raceway
   Pull and junction box fill calculation
   New single-phase dwelling services and feaders

Chapter 4: Equipment for General Use

   Flexible cords and cables
   Receptacle requirements
   Switchboards and panel boards
   Short circuit rating
   Luminaires, appliances, transformers and motors

Chapter 5: Special Occupancies

   Hazardous locations
   Commercial garages
   Health care facility requirements
   Recreational vehicle parks

Chapter 6: Special Equipment

   Signs, outline lighting, elevators
   Hybrid vehicle plug in requirements
   Data center requirements
   Pools and spas
   Solar photovoltaic systems
   Small wind turbine systems

Chapter 7: Special Conditions

   Emergency systems
   Class 1, 2, and 3 power-limited circuits
   Fire alarm circuits

Chapter 8: Communications Circuits

   Premises-powered broadband communication systems
   Network-powered broadband communication systems

Chapter 9: Tables

   Conductor fill and raceway calculation example

Credits

Architects
     7.0 HSW CE/Contact Hours
     7.0 AIA HSW Learning Units

Professional Engineers
     7.0 CE Hours/PDHs

International Code Council
     .7 CEUs – Electrical

Contractors
     Non-Credit CE Opportunity

Continuing Education Credit Information

This seminar is open to the public and offers up to 7.0 HSW continuing education/contact hours to architects and 7.0 continuing education hours/PDHs to engineers in all states. Educators and courses are not subject to preapproval in Virginia.

This event has been approved by the American Institute of Architects for 7.0 HSW Learning Units (Sponsor No. J885).

HalfMoon Education is an approved continuing education sponsor for architects in Florida and is deemed an approved sponsor in New York. HalfMoon Education is an approved continuing education sponsor for engineers in Florida, Indiana, Louisiana, Maryland, New Jersey (ApprovalNo. 24GP00000700), New York (NYSED Sponsor No. 35), North Carolina, and North Dakota.

The International Code Council has approved this program for .7 CEUs in the specialty area of Electrical.

This seminar offers a continuing education opportunity to construction contractors but has not been approved by any state contractor licensing entity.

Attendance will be monitored, and attendance certificates will be available after the seminar for most individuals who complete the entire program. Attendance certificates not available at the seminar will be mailed to participants within fifteen business days.

Speakers

David Ballentine

Surging Forward

Electrical consultant with Surging ForwardMr. Ballentine has over 28 years of experience in the electrical construction field, 18 of those years have been in project management or related fields. Mr. Ballentine has been involved in the planning and design of various blocks in the town center area of Virginia Beach, Virginia, including assisting with the design of the security system at the Westin Hotel. He has been involved in coordinating subcontractor conflicts as a liaison when conflicts arise. He has also served on various safety committees giving him exposure to various phases of the construction industry. Mr. Ballentine provided engineering services for the expansion of the 36-mgd Atlantic Treatment Plant to 54 mgd, with provisions for a future expansion to 72 mgd. He has provided planning, design, and construction-phase services for the upgrade of the 18-mgd Army Base Treatment Plant in Norfolk, Virginia. Mr. Ballentine has worked projects that have included high voltage, security systems, fire alarm systems, HAVC systems, Switchgear, instrumentation, lighting, DDC controls, pumping systems, waste water treatment piping, electrical and storm water installations.