Construction Scheduling and Cost Control Seminar
Agenda
Registration: 8:00 – 8:30 am
Morning Session: 8:30 – 11:45 am
Lunch (On your own): 11:45 am – 12:45 pm
Afternoon Session: 12:45 – 5:00 pm
Introduction – The Role of Scheduling in Project Planning
S. McCune
How good scheduling and planning affects projects
Increased productivity
Increased quality assurance
Increased safety
Cost Control
D. Battle
History of the estimator
The transformation of the estimator
Estimator’s new roles as construction managers
Value of theparallel estimate
Project Control
D. Battle
Translating an estimate into a schedule of values
Developing a bar-chart from the schedule of values
Determine bar-chart over-lapping activities
Gilbane Card Trick & Bar “Gantt” Charts
S. McCune/C. Sonderby
Development of construction schedules
Advantages and disadvantages of the most common schedules
Creating the most common bar charts
Introduction to Critical Path Method “CPM” Scheduling
C. Sonderby
Development of a CPM type schedule
Advantages and disadvantages
Finding the critical activities and the critical path
Fine-Tuning and Changing the Schedule
S. McCune/C. Sonderby
Resource allocation and resource leveling
Float and lag
Delays and changes
Computerized scheduling
Primavera, Microsoft Project, others
Credits
Professional Engineers
7.0 PDHs
Architects
7.0 AIA Learning Units
(Not Eligible for Texas Architects)
Contractors
Non-Credit Continuing Ed.
Continuing Education Credit Information
This seminar is open to the public and offers 7.0 PDHs to professional engineers in most states. Educators and courses are not subject to pre-approval in Texas.
HalfMoon Education is an approved continuing education sponsor for engineers in Florida, Indiana (License No. CE21700059), Maryland, New Jersey (Approval No. 24GP00000700), North Carolina, and North Dakota.
This course offers a non-credit continuing education opportunity to Texas architects. The subject of this seminar has been deemed non-HSW by the American Institute of Architects, who has approved for 7.0 Learning Units (Sponsor No. J885). Only full attendance can be reported to the AIA/CES.
This seminar offers a non-credit continuing education opportunity to contractors. It has not been approved by any state contractor licensing entity for continuing education approval.
Attendance will be monitored, and attendance certificates will be available after the seminar for most individuals who complete the entire event. Attendance certificates not available at the seminar will be mailed to participants within fifteen business days.
Speakers
David Battle
Pre Construction Services, Inc.Pre Construction Services, Inc.
Mr. Battle has over 42 years of experience in cost estimating. He is a certified professional estimator through the American Society of Professional Estimators and is a 1976 Construction Management graduate from Oklahoma State University. Since 1994, he has been a cost consultant, providing estimating, budgeting, construction advisor and project services to architects, developers and owners throughout Oklahoma and surrounding states. As a cost estimator for Pre Construction Services, Inc., Mr. Battle creates estimates are in CSI order, yet as required by the owner’s needs. He works with architects to create estimate reviews at the end of each phase of the schematic design phase, design development phase, and construction documents phase. Pre Construction Services, Inc. utilizes “Planswift” electronic on-screen take-off. Their costing is based on a combination of historical costing, assembly costing and RS Means costing. The firm has also developed a method of independent estimating paralleling the construction manager (CM) method of estimating. The parallel estimate provides a detailed breakdown for each CSI Division, in lieu of lump-sum preliminary sub-bids prepared by sub-contractors and inserted into the CM’S breakdown. This allows owners and architects to identify line items that may or may not be required for the final design. This approach allows an independent opinion that reinforces decisions to move forward by managers and owner representatives. It also identifies “budget busting” issues, providing an early breakdown before plans develop, protecting costly modifications to the design and delays to the owner’s schedule.
Stephen McCune
McCune Construction Services Group, LLC, and McCune Estimating Services, Inc.McCune Construction Services Group, LLC, and McCune Estimating Services, Inc.
Mr. McCune is a 40+ year veteran of the construction industry, a professional construction cost estimator and a project manager. He is currently vice president of McCune Estimating Services, Inc., president of McCune Construction, Inc., and founder and a managing member of McCune Construction Services Group, LLC. Mr. McCune is an active member of North Texas Association of Government Guaranteed Lenders (NTAGGL), Houston Association of Government Guaranteed Lenders (HAGGL), Central Texas Association of Government Guaranteed Lenders (CTAGGL), and the American Society of Professional Estimators (ASPE). He is a former treasurer and current secretary for ASPE Chapter #43, vice president of Certified Estimators Round Table (CERT), a Trammel Crow/US Leadership ACE Eagle award recipient, and a graduate of Rapport Leadership International and the Associated General Contractors – Supervisory Training Program (STP). Mr. McCune is currently serving as the District 6 commissioner on the City of Fort Worth – Urban Design Commission, and he is District 6’s representative on the newly-formed Mixed-Use Zoning Advisory Group (MUZAG) for city of Fort Worth, District 6. He has played a role in the construction or remodeling of projects across the Dallas/Fort Worth area, including DFW Airport, American Airlines, NBC, Texas Motor Speedway, Tarrant County, Dallas County, General Dynamics, Tarrant County Junior College, University of Texas at Arlington, City of Arlington, Texas Health Systems (Harris Health Systems), Baylor Medical, Ridgmar Mall, Federal Department of Corrections, Department of Treasury, and numerous churches, schools, hotels, retail center and residential projects. Mr. McCune is an Eagle Scout, a Friend of Scouting and is the former vice chairman of Brazos Valley District of Boy Scouts of America.