Agenda

Webinar instructions will be emailed before the date of the webinar.

Please log into the webinar 15 – 30 minutes before the start time.

Thursday, April 18, 2024 
1:00 – 3:00 pm CDT

 

Presented by: Lance Luke, CCC, CCI, CCPM, CSI

Agenda Highlights:

  • What Is a Change Order?
  • Reviewing Your Contract and Understanding the Changes Clause
  • Who Initiates the Change Order Process?
  • Typical Changes that Result in Change Orders 
  • Necessity for All Parties to Agree
  • Getting It in Writing
  • When the Parties Can’t Agree
  • Construction Change Directives
  • Resolving Disputes Arising from Changes

  

Webinar Instructions

All attendees must log-on through their own email – attendees may not watch together if they wish to earn continuing education credit. HalfMoon Education Inc. must be able to prove attendance if either the attendee or HalfMoon Education Inc. is audited.

Certificates of completion can be downloaded in PDF form upon passing a short quiz. A link to the quiz will be sent to each qualifying attendee immediately after the webinar. The certificate can be downloaded from the Results page of the quiz upon scoring 80% or higher.

Webinars are presented via GoToWebinar, an easy-to-use application that can be run on most systems and tablets. Instructions and login information will be provided in an email sent close to the date of the webinar. It is highly recommended that you download, install and test the application before the webinar begins by clicking on the link in the email.

GoToWebinar App requirements:
Windows 7 – 10 or Mac OSX Mavericks (10.9) – macOS Catalina (10.15)

Web Browser:
The two most recent version of the following browsers:
Google Chrome, Mozilla Firefox, Apple Safari, Microsoft Edge
Internet Explorer v11 (or later) with Flash enabled.

Internet connection: Minimum of 1Mbps       Hardware: 2GB RAM or more

For more information, visit the Support section at www.gotowebinar.com

Credits

Engineers
2.0 PDHs

Architects
2.0 Non-HSW CE Hours

AIA - American Institute of Architects
2.0 LUs

ICC - International Code Council
.2 CEUs (Administration) 

 

Continuing Education Credit Information

This webinar is open to the public and is designed to qualify for 2.0 PDHs for professional engineers and 2.0 continuing education hours for licensed architects in most states. *This course is not approved in states that require HSW coursework, including New York; please refer to specific state rules to determine eligibility.

HalfMoon Education is an approved continuing education sponsor for engineers in Florida (Provider License No: CEA362), Indiana (License No. CE21700059), Maryland, New Jersey (Approval No. 24GP00000700) and North Carolina (S-0130).

The American Institute of Architects Continuing Education System has approved this course for 2.0 LUs (Sponsor No. J885). Only full participation is reportable to the AIA/CES.

The International Code Council has approved this event for .2 CEUs in the specialty area of Administration (Preferred Provider No. 1232).

Attendance will be monitored, and attendance certificates will be available after the webinar for those who attend the entire course and score a minimum 80% on the quiz that follows the course (multiple attempts allowed).

On-Demand Credits

The preceding credit information only applies to the live presentation. This course in an on-demand format may not be eligible for the same credits as the live presentation; please consult your licensing board(s) to ensure that a structured, asynchronous learning format is appropriate. The following pre-approvals may be available for the on-demand format upon request:

2.0 LUs (AIA)

Speakers

Lance Luke, CCI, CCPM, CCC, CHI

National Building Expert, Principal Engineer of Construction Management Inspection LLC

Mr. Luke has over 40 years of experience in the construction and engineering industry. He offers inspections, construction management, and construction consultation for residential and commercial projects and is a national speaker on topics such as construction; engineering, building safety, real estate, construction litigation, expert witness services, building codes and more. Mr. Luke is a three-time best-selling author on the subjects of construction management and building safety and has numerous articles published in national construction, design and management publications. He has also been a featured guest on national media shows such as Times Square Today and Hollywood Live, which were broadcast on national media outlets such as ABC, CNBC, CNN, NBC, Fox Affiliates, A&E and Bravo. In his speaking career, Mr. Luke conducts up to 30 presentations annually, including educational webinars and seminars targeted toward the construction, real estate, and property management industries. He has also participated in expert panels, discussing construction litigation and building code compliance. Mr. Luke is a member of various national construction associations and has earned certifications for: Certified Construction Inspector, Certified Construction Project Manager, Certified Construction Consultant and Certified Building Inspector.

AIA Info

AIA Provider Statement:

HalfMoon Education Inc. is a registered provider of AIA-approved continuing education under Provider Number J885. All registered AIA/CES Providers must comply with the AIA Standards for Continuing Education Programs. Any questions or concerns about this provider of learning program may be sent to AIA/CES (cesupport@aia.org or (800) AIA 3837, Option 3).

This learning program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.

AIA continuing education credit has been reviewed and approved by AIA/CES. Learners must complete the entire learning program to receive continuing education credit. AIA continuing education Learning Units earned upon completion of this course will be reported to AIA/CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.

Course Title: Deep Dive into Construction Change Orders

Delivery Method: Live Online

Course Description:  This short two-hour course examines construction contract change orders. The course will explain what a change order is, who can initiate the change order process, typical changes that result in change orders, the importance of getting all parties to agree in writing, and how to resolve disputes that arise from changes.

Learning Objectives:

Learning Objective 1:
Learners will be able to explain what a change order is and who can initiate the change order process.

Learning Objective 2:
Learners will be able to provide examples of the types of project scope and timing changes that typically result in change orders.

Learning Objective 3:
Learners will be able to explain the importance of all parties agreeing to the change and getting in it writing.

Learning Objective 4:
Learners will be able to describe the process for resolving disputes that arise from construction change orders.

LUs: 2.0                                                                                              LU Type: LU|HSWs.

Prerequisites: Some experience with construction contracts.

Advance Preparation: None

Program Level: Intermediate

Course Expiration Date: 02/08/2027

Complaint Resolution Policy:

Complaints regarding this course can be emailed to fchapman@halfmoonseminars.org or by calling (715) 835-5900. A HalfMoon Education representative will respond within 72 hours to resolve the complaint, which will include, but not limited to, access to another CE activity at no or reduced cost or a full or partial refund. Each instance will be resolved on a case-by-case situation.

Streamable MP4/PDF Price: Original price was: $119.00.Current price is: $59.50.

2 Knowledge Points

Purchase this course using Knowledge Points by clicking the button below.

(Account login required. Knowledge Points can only be redeemed by the owner of the points. Cannot be combined with any other forms of payment)

Log in to redeem Knowledge Points

Learn more about Knowledge Points.