Agenda

 Webinar instructions will be emailed before the date of the webinar.

Please log into the webinar 15 – 30 minutes before start time.

Tuesday, April 27, 2021
 11:00 am – 12:00 pm CDT

Presented by Manuel Nuño, P.E., LEED AP, CPESC, QSD/QSP, CFM

Agenda:
Methods of minimizing site disturbance
Source control practices for minimizing sediment loss
Erosion control practices for cut/fill slopes
Sediment control practices for disturbed areas on a construction site
Water quality and non-point source pollution controls
Long-term stabilization measures for construction sites


Webinar Instructions

All attendees must log-on through their own email – attendees may not watch together if they wish to earn continuing education credit. HalfMoon Education Inc. must be able to prove attendance if either the attendee or HalfMoon Education Inc. is audited.

Certificates of completion can be downloaded in PDF form upon passing a short quiz. A link to the quiz will be sent to each qualifying attendee immediately after the webinar. The certificate can be downloaded from the Results page of the quiz upon scoring 80% or higher.

Webinars are presented via GoToWebinar, an easy-to-use application that can be run on most systems and tablets. Instructions and login information will be provided in an email sent close to the date of the webinar. It is highly recommended that you download, install and test the application before the webinar begins by clicking on the link in the email.

GoToWebinar App requirements:
Windows 7 – 10 or Mac OSX Mavericks (10.9) – macOS Catalina (10.15)

Web Browser:
The two most recent version of the following browsers:
Google Chrome, Mozilla Firefox, Apple Safari, Microsoft Edge
Internet Explorer v11 (or later) with Flash enabled


Internet connection:
 Minimum of 1Mbps       Hardware: 2GB RAM or more

For more information, visit the Support section at www.gotowebinar.com

Credits

Professional Engineers:
1.0 PDH

Architects:
1.0 HSW CE Hour
(Excluding FL, NJ, NC)

AIA:   (AIA credits only available for attending live Webinar)
1.0 LU|HSW

Landscape Architects:
1.0 HSW CE Hour

LA CES:   (LA CES credits only available for attending live Webinar)
1.0 LU|HSW

International Code Council:
.1 CEU (Sitework)

Floodplain Managers:
1.0 ASFPM CEC


Continuing Education Credit Information

Individual courses for landscape architects, engineers and architects are not
subject to pre-approval. HalfMoon Education does not apply for landscape courses in
FL, NC, and NJ, unless expressly stated.

HalfMoon Education Certifying Entities:
Landscape Architect Continuing Education System
American Institute of Architects Continuing Education System (Sponsor No. J885)
International Code Council (Preferred Provider No. 1232)
American Institute of Certified Planners (APA)
Boards of Engineering: Florida (No. 0004647), Indiana (License No. CE21700059),
Maryland, New Jersey (Approval No. 24GP00000700), North Carolina (No. S-0130),
and North Dakota.
Course-by-Course Organizations:
International Society of Arboriculture
Society of American Foresters
Association of State Floodplain Managers

HalfMoon Education is deemed a New York-approved continuing education provider
for landscape architects, engineers and architects via its registration with the
American Institute of Architects Continuing Education System (Regulations of the
Commissioner §79-1.5(i)(2), §68.14(i)(2) and §69.6(i)(2)).

Speakers

Manuel “Manny” Nuño, P.E., CFM, LEED AP, CPESC

Senior Project Manager at Ware Malcomb

Mr. Nuño is a senior project manager at the Denver office of Ware Malcomb. A 2008 graduate of the University of Notre Dame with a specialty in structural and environmental engineering, he has established himself as a leader in the field of drainage and erosion and sediment control. In his 15-year career, Mr. Nuño has excelled in the design of land development projects including grading, utility design, stormwater management, and erosion control. Through his experiences as a consulting engineer, he has prepared civil construction plans for such clients as Marriott International, San Diego Gas & Electric (SDG&E), Lennar Homes, Oakwood Homes, and Kiewit Infrastructure West. In the field, Mr. Nuño has provided stormwater inspection services for SDG&E, Caesars Entertainment Group, and public agencies such as the City of Carlsbad, California, and the Town of Elizabeth, CO. He has managed civil projects in 17 different states and prides himself on working with developers, architects, and contractors to bridge the gap between regulatory compliance and constructability in the field. Mr. Nuño is a registered professional engineer in Colorado, Montana, Wyoming, and California; a Certified Floodplain Manager; a certified professional in erosion and sediment control a Colorado LEED accredited professional, and a qualified SWPPP developer/practitioner. He is an active member in the American Society of Civil Engineers, the Urban Land Institute, and the Colorado Association of Stormwater and Floodplain Managers.

AIA Info

AIA Provider Statement:

HalfMoon Education Inc. is a registered provider of AIA-approved continuing education under Provider Number J885. All registered AIA/CES Providers must comply with the AIA Standards for Continuing Education Programs. Any questions or concerns about this provider of learning program may be sent to AIA/CES (cesupport@aia.org or (800) AIA 3837, Option 3).

This learning program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.

AIA continuing education credit has been reviewed and approved by AIA/CES. Learners must complete the entire learning program to receive continuing education credit. AIA continuing education Learning Units earned upon completion of this course will be reported to AIA/CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.

Course Title: How To Set Goals for and Select Erosion and Sediment Control Practices

Delivery Method: Live Online

Course Description: This course examines strategies for preventing erosion and sedimentation problems during construction and enacting sediment control practices in disturbed construction sites.

Learning Objectives:

Learning Objective 1:
Learners will be able to apply methods of minimizing site disturbances during construction projects.

Learning Objective 2:
Learners will be able to describe source control practices for minimizing sediment loss during site development.

Learning Objective 3:
Learners will be able to discuss erosion control practices for cut slopes and sediment control practices for disturbed areas on construction sites.

Learning Objective 4:
Learners will be able to enact long-term site stabilization measures for construction sites.

LUs: 1.0                                                                                              LU Type: LU|HSWs.

Prerequisites: Experience with site development and earthwork

Advance Preparation: None

Program Level: Intermediate

Course Expiration Date: 02/19/2024

Complaint Resolution Policy:

Complaints regarding this course can be emailed to doug@halfmoonseminars.org or by calling (715) 835-5900. A HalfMoon Education representative will respond within 72 hours to resolve the complaint, which will include, but not limited to, access to another CE activity at no or reduced cost or a full or partial refund. Each instance will be resolved on a case-by-case situation.

USB MP4/PDF Price: $60.00